Modelling and solving the production rate variation problem (PRVP)
From MaRDI portal
Publication:1383316
DOI10.1007/BF02568551zbMath0892.90090MaRDI QIDQ1383316
Albert Corominas, Ramon Companys, Joaquín Bautista
Publication date: 13 April 1998
Published in: Top (Search for Journal in Brave)
Related Items (5)
Response time variability ⋮ A branch and bound algorithm for the response time variability problem ⋮ Solving the generalized apportionment problem through the optimization of discrepancy functions ⋮ Mathematical programming modeling of the response time variability problem ⋮ Solving the minmax product rate variation problem (PRVP) as a bottleneck assignment problem
Cites Work
- A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems
- Heuristics and exact algorithms for solving the Monden problem
- A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems
- Minimizing variation of production rates in just-in-time systems: A survey
- A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems”
- Note—Sequencing JIT Mixed-Model Assembly Lines
- Developing production schedules which balance part usage and smooth production loads for just-in-time production systems
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties
- Level Schedules for Mixed-Model, Just-in-Time Processes
This page was built for publication: Modelling and solving the production rate variation problem (PRVP)