Heuristic procedures for minimizing makespan and the number of required pallets
From MaRDI portal
Publication:1390237
DOI10.1016/0377-2217(94)00059-LzbMath0913.90163OpenAlexW2061931336MaRDI QIDQ1390237
Chengbin Chu, Suresh P. Sethi, Jean Marie Proth
Publication date: 14 July 1998
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)00059-l
Related Items (2)
Minimizing the weighted number of tardy jobs on multiple machines: a review ⋮ A new heuristic for \(m\)-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- The application of the simulated annealing algorithm to the solution of the \(n/m/C_{\max}\) flowshop problem
- Some efficient heuristic methods for the flow shop sequencing problem
- A new heuristic method for the flow shop sequencing problem
- On two-machine scheduling with release and due dates to minimize maximum lateness
- A new heuristic for the n-job, M-machine flow-shop problem
- Optimal two- and three-stage production schedules with setup times included
- A survey and evaluation of static flowshop scheduling heuristics
- On general routing problems
- A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
This page was built for publication: Heuristic procedures for minimizing makespan and the number of required pallets