An application of a multi-objective programming technique to construction accuracy control of cable-stayed bridges
From MaRDI portal
Publication:1390350
DOI10.1016/0377-2217(95)00241-3zbMath0915.90265OpenAlexW2084672371MaRDI QIDQ1390350
Kazuyoshi Kaneshige, Yasuo Watada, Shinji Takemoto, Hirotaka Nakayama
Publication date: 1995
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(95)00241-3
multi-objective optimizationcable-stayed bridgesconstruction accuracy controlsatisficing trade-off method
Related Items (1)
Cites Work
This page was built for publication: An application of a multi-objective programming technique to construction accuracy control of cable-stayed bridges