A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.

From MaRDI portal
Publication:1399573

DOI10.1016/S0377-2217(02)00761-0zbMath1040.90015MaRDI QIDQ1399573

K. Bouleimen, H. Lecocq

Publication date: 30 July 2003

Published in: European Journal of Operational Research (Search for Journal in Brave)




Related Items (68)

Quantum annealing for combinatorial clusteringAn integrated model to improve ergonomic and economic performance in order picking by rotating palletsA polarized adaptive schedule generation scheme for the resource-constrained project scheduling problemMulti-mode resource constrained multi-project scheduling and resource portfolio problemMulti-mode resource availability cost problem with recruitment and release dates for resourcesBi-objective multi-mode project scheduling under risk aversionSolving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computationExperimental investigation of heuristics for resource-constrained project scheduling: an updatePriority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splittingA filter-and-fan approach with adaptive neighborhood switching for resource-constrained project schedulingOptimizing resource-constrained project scheduling problem considering the reliability functionAn efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode caseOptimization in dubbing schedulingProject scheduling with finite or infinite number of activity processing modes -- a surveyMulti‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristicNew concepts for activity float in resource-constrained project managementA data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problemA new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.Resource-constrained project scheduling: A critical activity reordering heuristicOrder-based neighborhoods for project scheduling with nonregular objective functions.Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problemR\&D pipeline management: task interdependencies and risk managementA \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project schedulingMulti-mode resource-constrained project scheduling using RCPSP and SAT solversProperties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splittingA hybrid metaheuristic for the resource-constrained project scheduling problemAn effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problemIncreasing airport capacity utilisation through optimum slot scheduling: review of current developments and identification of future needsTri-directional scheduling scheme: theory and computationNew representation to reduce the search space for the resource-constrained project scheduling problemConsidering project management activities for engineering design groupsA hybrid genetic algorithm for the resource-constrained project scheduling problemA combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problemsA random key based genetic algorithm for the resource constrained project scheduling problemA local search framework for industrial test laboratory schedulingResource tardiness weighted cost minimization in project schedulingTowards merging binary integer programming techniques with genetic algorithmsImproving simulated annealing with variable neighborhood search to solve the resource-constrained scheduling problemMode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problemA multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problemResource constrained project scheduling subject to due dates: preemption permitted with penaltyMetaheuristics for multi-mode capital-constrained project payment schedulingAugmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problemProject scheduling heuristics-based standard PSO for task-resource assignment in heterogeneous gridAn experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instancesAn effective shuffled frog-leaping algorithm for resource-constrained project scheduling problemSimulated annealing heuristics for the dynamic facility layout problemA neurogenetic approach for the resource-constrained project scheduling problemA hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problemBenders decomposition, Lagrangean relaxation and metaheuristic designTheoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy modelsA survey of hybrid metaheuristics for the resource-constrained project scheduling problemA multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problemA survey of variants and extensions of the resource-constrained project scheduling problemA robust optimization approach for the multi-mode resource-constrained project scheduling problemA modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splittingProject selection, scheduling and resource allocation with time dependent returnsProbability mechanism based particle swarm optimization algorithm and its application in resource-constrained project scheduling problemsDifferential evolution for solving multi-mode resource-constrained project scheduling problemsResource-constrained project scheduling: Notation, classification, models, and methodsSimulated annealing for financing cost distribution based project payment scheduling from a joint perspectiveA genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problemSimulated annealing and tabu search for multi-mode project payment schedulingActivity list representation for a generalization of the resource-constrained project scheduling problemAn innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrainsA multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problemA hybrid scatter search/electromagnetism meta-heuristic for project schedulingExperimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem


Uses Software


Cites Work




This page was built for publication: A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.