A branch-and-bound algorithm for the resource-constrained project scheduling problem

From MaRDI portal
Publication:1401642

DOI10.1007/s001860000091zbMath1023.90024OpenAlexW1999539329MaRDI QIDQ1401642

Erwin Pesch, Toàn Phan-Huy, Ulrich Dorndorf

Publication date: 18 August 2003

Published in: Mathematical Methods of Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s001860000091




Related Items (19)

An exact algorithm for an integrated project staffing problem with a homogeneous workforceA polarized adaptive schedule generation scheme for the resource-constrained project scheduling problemEnergetic reasoning revisited: Application to parallel machine schedulingRobust optimization models for project scheduling with resource availability costA prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problemA Boolean satisfiability approach to the resource-constrained project scheduling problemProject scheduling with flexible resources: formulation and inequalitiesStrong valid inequalities for the resource-constrained scheduling problem with uniform resource requirementsA hybrid genetic algorithm for the resource-constrained project scheduling problemA constraint programming approach for the resource-constrained project scheduling problemResource tardiness weighted cost minimization in project schedulingA PARTICLE SWARM OPTIMIZATION-BASED ALGORITHM FOR JOB-SHOP SCHEDULING PROBLEMSScheduling and constraint propagationA neurogenetic approach for the resource-constrained project scheduling problemJustification and RCPSP: a technique that paysTheoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy modelsProject selection, scheduling and resource allocation with time dependent returnsProbability mechanism based particle swarm optimization algorithm and its application in resource-constrained project scheduling problemsDynamic multiobjective software project scheduling optimization method based on firework algorithm




This page was built for publication: A branch-and-bound algorithm for the resource-constrained project scheduling problem