Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Solving the discrete-continuous project scheduling problem via its discretization

From MaRDI portal
Publication:1401646
Jump to:navigation, search

DOI10.1007/s001860000094zbMath1023.90027OpenAlexW1963825388MaRDI QIDQ1401646

Grzegorz Waligóra, Marek Mika, Joanna Józefowska, Rafal Rózycki, Jan Weglarz

Publication date: 18 August 2003

Published in: Mathematical Methods of Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s001860000094


zbMATH Keywords

simulated annealingmulti-mode project schedulingcontinuous resourcesdiscrete resources


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)


Related Items (5)

Scheduling shared continuous resources on many-cores ⋮ MIP models for resource-constrained project scheduling with flexible resource profiles ⋮ Project scheduling with finite or infinite number of activity processing modes -- a survey ⋮ Heuristic approaches to discrete-continuous project scheduling problems to minimize the makespan ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem




This page was built for publication: Solving the discrete-continuous project scheduling problem via its discretization

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1401646&oldid=13560939"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 31 January 2024, at 16:00.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki