Concurrent open shop scheduling to minimize the weighted number of tardy jobs
From MaRDI portal
Publication:1404274
DOI10.1023/A:1024284828374zbMath1027.90033OpenAlexW2012691563MaRDI QIDQ1404274
Publication date: 21 August 2003
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1023/a:1024284828374
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (14)
Minimizing the weighted number of tardy jobs on multiple machines: a review ⋮ Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures ⋮ Minimizing maximum delivery completion time for order scheduling with rejection ⋮ Customer order scheduling to minimize the number of late jobs ⋮ The representation of partially-concurrent open shop problems ⋮ Customer order scheduling on a single machine with family setup times: complexity and algorithms ⋮ A note on the complexity of the concurrent open shop problem ⋮ Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work ⋮ Partially concurrent open shop scheduling with integral preemptions ⋮ Scheduling with centralized and decentralized batching policies in concurrent open shops ⋮ Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time ⋮ Two-machine flowshop scheduling in a physical examination center ⋮ A note on the complexity of two supply chain scheduling problems ⋮ Scheduling orders for multiple product types with due date related objectives
This page was built for publication: Concurrent open shop scheduling to minimize the weighted number of tardy jobs