Learning complementarity and setup time reduction.
From MaRDI portal
Publication:1406634
DOI10.1016/S0305-0548(97)00072-5zbMath1042.90510MaRDI QIDQ1406634
Publication date: 7 September 2003
Published in: Computers \& Operations Research (Search for Journal in Brave)
Neural networks for/in biological studies, artificial life and related topics (92B20) Inventory, storage, reservoirs (90B05)
Related Items (1)
Cites Work
- Unnamed Item
- Lot sizes and setup frequency with learning in setups and process quality
- Capacitated lot sizing under setup learning
- Progress with single-item lot-sizing
- Production lot sizing under setup and worker learning
- Multi-Item Single-Level Capacitated Dynamic Lot-Sizing Heuristics: A General Review
- A Review of Production Scheduling
- A Dynamic Lot Sizing Model with Learning in Setups
- Scheduling Parallel Production Lines with Changeover Costs: Practical Application of a Quadratic Assignment/LP Approach
This page was built for publication: Learning complementarity and setup time reduction.