Improved heuristic methods for multiple stage production planning.
From MaRDI portal
Publication:1406665
DOI10.1016/S0305-0548(97)00089-0zbMath1042.90555OpenAlexW2023984058WikidataQ126843257 ScholiaQ126843257MaRDI QIDQ1406665
Natalie C. Simpson, S. Selcuk Erenguc
Publication date: 7 September 2003
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0305-0548(97)00089-0
Related Items
Central versus local multiple stage inventory planning: an analysis of solutions ⋮ Incorporating a database approach into the large-scale multi-level lot sizing problem ⋮ Negotiation-based collaborative planning between supply chains partners ⋮ Negotiation-based collaborative planning in divergent two-tier supply chains
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Dynamic Version of the Economic Lot Size Model
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
- Optimal Lot-Sizing Algorithms for Complex Product Structures
- Optimal Multi-Level Lot Sizing for Requirements Planning Systems
- Rank Transformations as a Bridge Between Parametric and Nonparametric Statistics
- Improved Heuristics for Multi-Stage Requirements Planning Systems
- Tabu Search—Part I
- Dynamic Lot Size Models for Multi-Stage Assembly Systems
- Efficient, Effective Lot Sizing for Multistage Production Systems
- A Deterministic Multiproduct, Multi-Facility Production and Inventory Model
- A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach
- Minimum Concave-Cost Solution of Leontief Substitution Models of Multi-Facility Inventory Systems
- Economic Lot Size Determination in Multi-Stage Assembly Systems