No-wait flowshops with bicriteria of makespan and maximum lateness.

From MaRDI portal
Publication:1410329

DOI10.1016/S0377-2217(02)00646-XzbMath1044.90040OpenAlexW1966577583MaRDI QIDQ1410329

Ali Allahverdi, Tariq A. Aldowaisan

Publication date: 14 October 2003

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0377-2217(02)00646-x




Related Items (15)



Cites Work




This page was built for publication: No-wait flowshops with bicriteria of makespan and maximum lateness.