Material compatibility constraints for make-to-order production planning.
From MaRDI portal
Publication:1412704
DOI10.1016/S0167-6377(03)00045-2zbMath1049.90020OpenAlexW1989790681MaRDI QIDQ1412704
Michael O. Ball, Zhen-Ying Zhao, Chien-Yu Chen
Publication date: 25 November 2003
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0167-6377(03)00045-2
Related Items
A new AATP model with considering supply chain lead-times and resources and scheduling of the orders in flowshop production systems: a graph-theoretic view ⋮ Separation, dimension, and facet algorithms for node flow polyhedra ⋮ Optimization-based available-to-promise with multi-stage resource availability
Cites Work