Open shop scheduling problems with late work criteria.

From MaRDI portal
Publication:1421458

DOI10.1016/S0166-218X(03)00339-1zbMath1043.90026OpenAlexW2118724997WikidataQ57387795 ScholiaQ57387795MaRDI QIDQ1421458

Małgorzata Sterna, Frank Werner, Jacek Błażewicz, Erwin Pesch

Publication date: 26 January 2004

Published in: Discrete Applied Mathematics (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0166-218x(03)00339-1




Related Items (19)

Semi-online scheduling on two identical machines with a common due date to maximize total early workMinimizing the total weighted late work in scheduling of identical parallel processors with communication delaysA new particle swarm optimization for multi-objective open shop schedulingTwo-machine flow-shop scheduling to minimize total late work: revisitedMetaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due datePolynomial time approximation scheme for two parallel machines scheduling with a common due date to maximize early workA note on the two machine job shop with the weighted late work criterionA common approximation framework for early work, late work, and resource leveling problemsA no-delay single machine scheduling problem to minimize total weighted early and late workSingle-machine preemptive scheduling with release dates involving the total weighted late work criterionSingle-machine scheduling with multi-agents to minimize total weighted late workA two-agent single-machine scheduling problem with late work criteriaScheduling on parallel identical machines with late work criterion: offline and online casesTwo-machine open shop problem with controllable processing timesThe two-machine flow-shop problem with weighted late work criterion and common due dateA Branch-and-Bound Algorithm for Two-Agent Scheduling with Learning Effect and Late Work CriterionMinimizing total weighted late work in the resource-constrained project scheduling problemFully polynomial time approximation scheme to maximize early work on parallel machines with common due dateTwo-machine flow shop scheduling with a common due date to maximize total early work



Cites Work




This page was built for publication: Open shop scheduling problems with late work criteria.