Solving the resource-constrained project scheduling problem by a variable neighbourhood search.

From MaRDI portal
Publication:1427560

DOI10.1016/S0377-2217(02)00884-6zbMath1045.90028OpenAlexW1974300423WikidataQ57254148 ScholiaQ57254148MaRDI QIDQ1427560

Khalil S. Hindi, Krzysztof Fleszar

Publication date: 14 March 2004

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0377-2217(02)00884-6




Related Items (26)

Experimental investigation of heuristics for resource-constrained project scheduling: an updateA filter-and-fan approach with adaptive neighborhood switching for resource-constrained project schedulingSolving the unconstrained optimization problem by a variable neighborhood searchMulti‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristicA branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer timesPerformance analysis of active schedules in identical parallel machineStrong valid inequalities for the resource-constrained scheduling problem with uniform resource requirementsA hybrid genetic algorithm for the resource-constrained project scheduling problemA generic two-phase stochastic variable neighborhood approach for effectively solving the nurse rostering problemPERMUTATION-BASED GENETIC, TABU, AND VARIABLE NEIGHBORHOOD SEARCH HEURISTICS FOR MULTIPROCESSOR SCHEDULING WITH COMMUNICATION DELAYSSolving the resource-constrained project scheduling problem using filter-and-fan approachA random key based genetic algorithm for the resource constrained project scheduling problemTowards merging binary integer programming techniques with genetic algorithmsA variable-neighbourhood search algorithm for finding optimal run orders in the presence of serial correlationMinimizing makespan in permutation flow shop scheduling problems using a hybrid metaheuristic algorithmAugmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problemVariable neighbourhood search: methods and applicationsA hybrid metaheuristic for the prize-collecting single machine scheduling problem with sequence-dependent setup timesA survey of hybrid metaheuristics for the resource-constrained project scheduling problemProbability mechanism based particle swarm optimization algorithm and its application in resource-constrained project scheduling problemsCOMBINING PROCESS SELECTION AND LOT SIZING MODELS FOR PRODUCTION SCHEDULING OF ELECTROFUSED GRAINSSOLVING THE OPEN SHOP SCHEDULING PROBLEM VIA A HYBRID GENETIC-VARIABLE NEIGHBORHOOD SEARCH ALGORITHMVariable neighbourhood search: Methods and applicationsActivity list representation for a generalization of the resource-constrained project scheduling problemA nonlinear multidimensional knapsack problem in the optimal design of mixture experimentsA hybrid scatter search/electromagnetism meta-heuristic for project scheduling


Uses Software


Cites Work


This page was built for publication: Solving the resource-constrained project scheduling problem by a variable neighbourhood search.