Sequential inspection strategy for multiple systems under availability requirement.
From MaRDI portal
Publication:1428058
DOI10.1016/S0377-2217(02)00822-6zbMath1045.90016OpenAlexW2001208016MaRDI QIDQ1428058
Lirong Cui, Min Xie, Han Tong Loh
Publication date: 14 March 2004
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(02)00822-6
Related Items (4)
Multi-stage optimization for periodic inspection planning of geo-distributed infrastructure systems ⋮ Preventive replacement for systems with condition monitoring and additional manual inspections ⋮ A Further Study on Reliable Life Estimation under Ranked Set Sampling ⋮ State probability of a series-parallel repairable system with two-types of failure states
Cites Work
- Optimal inspection and replacement policies for multi-state deteriorating systems
- Inspection interval for maximum future reliability using the delay time model
- Optimal inspection policies for a storage system with degradation at periodic tests.
- IMPROVED INSPECTION SCHEMES FOR DETERIORATING EQUIPMENT
- Sequential inspection sampling to avoid failure critical items being in an at risk condition
- Comparison of sequential and continuous inspection strategies for deteriorating systems
This page was built for publication: Sequential inspection strategy for multiple systems under availability requirement.