Concurrent flowshop scheduling to minimize makespan.
From MaRDI portal
Publication:1429959
DOI10.1016/S0377-2217(03)00142-5zbMath1056.90070OpenAlexW1996331245MaRDI QIDQ1429959
Kyparisis, George J., Christos P. Koulamas
Publication date: 27 May 2004
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(03)00142-5
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (1)
Cites Work
- On some geometric methods in scheduling theory: A survey
- A heuristic algorithm for mean flowtime objective in flowshop scheduling
- The Tricriteria Two-Machine Flowshop Scheduling Problem
- Assembly-Line Scheduling with Concurrent Operations and Parallel Machines
- The Complexity of Flowshop and Jobshop Scheduling
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- A No-Wait Flowshop Scheduling Heuristic to Minimize Makespan
- Minimizing Makespan in a Class of Reentrant Shops
- Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times
- Vector Summation in Banach Space and Polynomial Algorithms for Flow Shops and Open Shops
- The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
This page was built for publication: Concurrent flowshop scheduling to minimize makespan.