Mud removal and cement placement during primary cementing of an oil well. II: Steady-state displacements
From MaRDI portal
Publication:1431243
DOI10.1023/B:ENGI.0000009499.63859.f0zbMath1178.76067OpenAlexW1963590090MaRDI QIDQ1431243
Publication date: 27 May 2004
Published in: Journal of Engineering Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1023/b:engi.0000009499.63859.f0
Related Items (13)
Ascending non-Newtonian long drops in vertical tubes ⋮ Displacement flows in horizontal, narrow, eccentric annuli with a moving inner cylinder ⋮ Primary cementing of oil and gas wells in turbulent and mixed regimes ⋮ Viscoplastic fluid displacements in horizontal narrow eccentric annuli: stratification and travelling wave solutions ⋮ An experimental study of laminar displacement flows in narrow vertical eccentric annuli ⋮ Non-Newtonian fluid displacements in horizontal narrow eccentric annuli: effects of slow motion of the inner cylinder ⋮ Transient effects in oilfield cementing flows: Qualitative behaviour ⋮ Kinematic instabilities in two-layer eccentric annular flows. I: Newtonian fluids ⋮ Dispersion induced by non-Newtonian gravity flow in a layered fracture or formation ⋮ Primary cementing of horizontal wells. Displacement flows in eccentric horizontal annuli. Part 2. Computations ⋮ Primary cementing of horizontal wells. Displacement flows in eccentric horizontal annuli. Part 1. Experiments ⋮ A model for foamed cementing of oil and gas wells ⋮ Kinematic instabilities in two-layer eccentric annular flows. II: Shear-thinning and yield-stress effects
This page was built for publication: Mud removal and cement placement during primary cementing of an oil well. II: Steady-state displacements