Note on cyclic sequences in the product rate variation problem
From MaRDI portal
Publication:1577992
DOI10.1016/S0377-2217(99)00179-4zbMath0969.90039MaRDI QIDQ1577992
Albert Corominas, Joaquín Bautista, Ramon Companys
Publication date: 19 September 2000
Published in: European Journal of Operational Research (Search for Journal in Brave)
Cites Work
- A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems
- Heuristics and exact algorithms for solving the Monden problem
- Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging
- A comment on ``A simple sequencing algorithm for mixed-model assembly lines in just-in-time production systems
- A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems
- Minimizing variation of production rates in just-in-time systems: A survey
- A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems”
- Note—Sequencing JIT Mixed-Model Assembly Lines
- Developing production schedules which balance part usage and smooth production loads for just-in-time production systems
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Level Schedules for Mixed-Model, Just-in-Time Processes
- A Note on the Relation between the Product Rate Variation (PRV) Problem and the Apportionment Problem
This page was built for publication: Note on cyclic sequences in the product rate variation problem