A large step random walk for minimizing total weighted tardiness in a job shop

From MaRDI portal
Publication:1579121

DOI<link itemprop=identifier href="https://doi.org/10.1002/(SICI)1099-1425(200005/06)3:3<125::AID-JOS40>3.0.CO;2-C" /><125::AID-JOS40>3.0.CO;2-C 10.1002/(SICI)1099-1425(200005/06)3:3<125::AID-JOS40>3.0.CO;2-CzbMath0969.90045OpenAlexW2051604785MaRDI QIDQ1579121

Stephan Kreipl

Publication date: 4 September 2000

Published in: Journal of Scheduling (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1002/(sici)1099-1425(200005/06)3:3<125::aid-jos40>3.0.co;2-c




Related Items (22)

Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problemA study on local search neighborhoods for the job shop scheduling problem with total weighted tardiness objectiveShifting bottleneck scheduling for total weighted tardiness minimization -- a computational evaluation of subproblem and re-optimization heuristicsHeuristic approaches for scheduling jobs in large-scale flexible job shopsMinimizing total weighted tardiness in a generalized job shopA simulated annealing algorithm based on block properties for the job shop scheduling problem with total weighted tardiness objectiveEnhancing local search algorithms for job shops with MIN-sum objectives by approximate move evaluationA hybrid shifting bottleneck-tabu search heuristic for the job shop total weighted tardiness problemA hybrid differential evolution and tree search algorithm for the job shop scheduling problemA PMBGA to optimize the selection of rules for job shop scheduling based on the Giffler-Thompson algorithmA general approach for optimizing regular criteria in the job-shop scheduling problemAutomatically evolving preference-based dispatching rules for multi-objective job shop schedulingA linear programming-based method for job shop schedulingAn exact approach for single machine subproblems in shifting bottleneck procedures for job shops with total weighted tardiness objectiveAn efficient genetic algorithm for job shop scheduling with tardiness objectives.A genetic local search algorithm for minimizing total weighted tardiness in the job-shop scheduling problemExtended GRASP for the job shop scheduling problem with total weighted tardiness objectiveThe job shop scheduling problem with convex costsMinimizing weighted tardiness of job-shop scheduling using a hybrid genetic algorithmAn Iterated Local Search Algorithm for the Lot-Streaming Flow Shop Scheduling ProblemComputing lower and upper bounds for a large-scale industrial job shop scheduling problemA tabu search algorithm to minimize total weighted tardiness for the job shop scheduling problem




Cites Work




This page was built for publication: A large step random walk for minimizing total weighted tardiness in a job shop