A genetic algorithm for scheduling staff of mixed skills under multi-criteria
From MaRDI portal
Publication:1580982
DOI10.1016/S0377-2217(99)00391-4zbMath0952.90007OpenAlexW2050279433MaRDI QIDQ1580982
Publication date: 2000
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(99)00391-4
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (21)
\textsc{Laps}\ \textsc{Care} -- an operational system for staff planning of home care ⋮ A mixed integer programming approach to multi-skilled workforce scheduling ⋮ Work assignment to and qualification of multi-skilled human resources under knowledge depreciation and company skill level targets ⋮ Scheduling and staffing multiple projects with a multi-skilled workforce ⋮ Multicriteria scheduling using fuzzy theory and tabu search ⋮ Workforce planning incorporating skills: state of the art ⋮ A constraint-based approach for the shift design personnel task scheduling problem with equity ⋮ Solving a multi-objective multi-skilled manpower scheduling model by a fuzzy goal programming approach ⋮ First-order linear programming in a column generation-based heuristic approach to the nurse rostering problem ⋮ On the complexity of efficient multi-skilled team composition ⋮ A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem ⋮ Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm ⋮ An improved MIP-based approach for a multi-skill workforce scheduling problem ⋮ Staff scheduling and rostering: a review of applications, methods and models. ⋮ A review of some issues and identification of some barriers in the implementation of FMS ⋮ An integrated staff-sizing approach considering feasibility of scheduling decision ⋮ Skilled workforce scheduling in service centres ⋮ Contingent manpower planning in a high clock speed industry ⋮ A three-stage mixed integer programming approach for optimizing the skill mix and training schedules for aircraft maintenance ⋮ A new algorithm for resource-constrained project scheduling with breadth and depth of skills ⋮ HARMONY SEARCH WITH NOVEL SELECTION METHODS IN MEMORY CONSIDERATION FOR NURSE ROSTERING PROBLEM
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- An algorithm for single shift scheduling of hierarchical workforce
- Sufficient Working Subsets for the Tour Scheduling Problem
- A Guaranteed-Accuracy Round-off Algorithm for Cyclic Scheduling and Set Covering
- Solving Large-Scale Tour Scheduling Problems
- A simulated annealing approach to the cyclic staff-scheduling problem
This page was built for publication: A genetic algorithm for scheduling staff of mixed skills under multi-criteria