An operational decision model for lead-time and price quotation in congested manufacturing systems
From MaRDI portal
Publication:1584792
DOI10.1016/S0377-2217(99)00294-5zbMath0970.90027MaRDI QIDQ1584792
Publication date: 11 January 2001
Published in: European Journal of Operational Research (Search for Journal in Brave)
Related Items (7)
Coping with production time variability via dynamic lead-time quotation ⋮ Incorporating manufacturing lead times in joint production-marketing models: A review and some future directions ⋮ A decision support system for order acceptance/rejection in hybrid MTS/MTO production systems ⋮ Price and Lead Time Quotation for Contract and Spot Customers ⋮ Manufacturing lead-time rules: customer retention versus tardiness costs ⋮ Research on optimization of production decision based on payment time and price coordination ⋮ Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach
Cites Work
- Unnamed Item
- Unnamed Item
- Setting Job-Shop Due-Dates with Service-Level Constraints
- Due Date Assignment for Production Systems
- Due-Date Setting and Priority Sequencing in a Multiclass M/G/1 Queue
- A Single Machine Model for Determination of Optimal Due Dates and Sequence
- A Simulation Study of Predictable Due-Dates
- Pricing and Delivery-Time Performance in a Competitive Environment
- Pricing, Production, Scheduling, and Delivery-Time Competition
- Quoting Customer Lead Times
- Optimal Dispatching in a Periodic Review Cellular Manufacturing System
- Solving the Fixed Charge Problem by Ranking the Extreme Points
This page was built for publication: An operational decision model for lead-time and price quotation in congested manufacturing systems