Input control in a batch production system with lead times, due dates and random yields
From MaRDI portal
Publication:1584793
DOI10.1016/S0377-2217(99)00295-7zbMath0970.90028MaRDI QIDQ1584793
Publication date: 5 November 2000
Published in: European Journal of Operational Research (Search for Journal in Brave)
Related Items (4)
A newsvendor analysis of a binomial yield production process ⋮ Optimal procurement and production planning for multi-product multi-stage production under yield uncertainty ⋮ Supplier diversification under binomial yield ⋮ An innovative approach for strategic capacity portfolio planning under uncertainties
Cites Work
- Unnamed Item
- Multiple lotsizing with random common-cause yield and rigid demand
- Multistage Production to Order with Rework Capability
- Production Control in Multistage Systems with Variable Yield Losses
- Optimal reject allowance with constant marginal production efficiency
- A Single Bottleneck System with Binomial Yields and Rigid Demand
- Supply management in assembly systems
- Lot Sizing with Random Yields: A Review
- Control Limits for Multi-stage Manufacturing Processes with Binomial Yield (Single and Multiple Production Runs)
- Periodic Review Production Models with Variable Capacity, Random Yield, and Uncertain Demand
- Dynamic Programming and Systems of Uncertain Duration
- Convex Analysis
- The Structure of Periodic Review Policies in the Presence of Random Yield
- Random Yield, Rework and Scrap in a Multistage Batch Manufacturing Environment
This page was built for publication: Input control in a batch production system with lead times, due dates and random yields