Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Optimal timing of project control points

From MaRDI portal
Publication:1590030
Jump to:navigation, search

DOI10.1016/S0377-2217(99)00492-0zbMath0990.90059MaRDI QIDQ1590030

Erdal Erel, Tzvi Raz

Publication date: 19 December 2000

Published in: European Journal of Operational Research (Search for Journal in Brave)


zbMATH Keywords

project managementproject control


Mathematics Subject Classification ID

Management decision making, including multiple objectives (90B50) Dynamic programming (90C39)


Related Items (5)

Determining the timing of project control points using a facility location model and simulation ⋮ Using the generalized maximum covering location model to control a project's progress ⋮ A nearest neighbour extension to project duration forecasting with artificial intelligence ⋮ A buffer control method for top-down project control ⋮ Formulation and solution of an optimal control problem for industrial project control






This page was built for publication: Optimal timing of project control points

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1590030&oldid=13878796"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 1 February 2024, at 02:15.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki