A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes

From MaRDI portal
Publication:1590036

DOI10.1016/S0377-2217(99)00496-8zbMath0990.90034MaRDI QIDQ1590036

François Roubellat, Christian Artigues

Publication date: 19 December 2000

Published in: European Journal of Operational Research (Search for Journal in Brave)




Related Items (19)

A flow-based tabu search algorithm for the RCPSP with transfer timesA classification of predictive-reactive project scheduling proceduresFeasible insertions in job shop scheduling, short cycles and stable setsModelling and solving generalised operational surgery scheduling problemsIntegration of routing into a resource-constrained project scheduling problem\(\Gamma\)-robust optimization of project scheduling problemsProject scheduling with finite or infinite number of activity processing modes -- a surveyInsertion techniques for static and dynamic resource-constrained project scheduling.Tropical optimization problems in time-constrained project schedulingTime slack-based techniques for robust project scheduling subject to resource uncertaintyAn experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instancesProject scheduling under uncertainty: survey and research potentialsPolyhedral Reformulation of a Scheduling Problem And Related Theoretical ResultsA generic deadlock-free reactive scheduling approachA lower bound for the job insertion problem.A newany-orderschedule generation scheme for resource-constrained project schedulingAnalysis of reactive deadlock-free scheduling in flexible job shopsThe resource-constrained activity insertion problem with minimum and maximum time lagsResource allocation by means of project networks: Dominance results



Cites Work


This page was built for publication: A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes