Minimizing maximum lateness with job families
From MaRDI portal
Publication:1590808
DOI10.1016/S0377-2217(99)00328-8zbMath0991.90064OpenAlexW2043097048MaRDI QIDQ1590808
Kenneth R. Baker, Michael J. Magazine
Publication date: 21 December 2000
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(99)00328-8
Related Items
A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness, ILS heuristics for the single-machine scheduling problem with sequence-dependent family setup times to minimize total tardiness, Heuristics for minimizing maximum lateness on a single machine with family-dependent set-up times, A survey of scheduling problems with setup times or costs, Approximation algorithms for problems in scheduling with set-ups, An online algorithm for a problem in scheduling with set-ups and release times, A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setups, Minimizing L max for the single machine scheduling problem with family set-ups, A simulated annealing algorithm for single machine scheduling problems with family setups, Scheduling with families of jobs and delivery coordination under job availability
Cites Work
- Unnamed Item
- Batch scheduling to minimize maximum lateness
- Single machine scheduling with batch set-up times to minimize maximum lateness
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity
- Complexity of Task Sequencing with Deadlines, Set-Up Times and Changeover Costs
- On the Complexity of Scheduling with Batch Setup Times
- Single-Machine Scheduling with Release Dates, Due Dates and Family Setup Times
- Scheduling Groups of Jobs on a Single Machine