A heuristic for single machine scheduling with early and tardy costs
From MaRDI portal
Publication:1592742
DOI10.1016/S0377-2217(99)00345-8zbMath0983.90021MaRDI QIDQ1592742
Renata Mazzini, Vinicius Amaral Armentano
Publication date: 25 January 2001
Published in: European Journal of Operational Research (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items
Preemption in single machine earliness/tardiness scheduling ⋮ Single machine scheduling to minimize total weighted earliness subject to minimal number of tardy jobs ⋮ Minmax scheduling with job-classes and earliness-tardiness costs ⋮ Multi-agent-based workload control for make-to-order manufacturing ⋮ Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness ⋮ A recovering beam search algorithm for the single machine just-in-time scheduling problem ⋮ Permutation flow shop scheduling with earliness and tardiness penalties ⋮ Counting and enumeration complexity with application to multicriteria scheduling
Cites Work
- A neighbourhood scheme with a compressed solution space for the early/tardy scheduling problem
- A decomposition algorithm for the single machine total tardiness problem
- Algorithms for a class of single-machine weighted tardiness and earliness problems
- Sequencing with Earliness and Tardiness Penalties: A Review
- The Single Machine Early/Tardy Problem
- One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties
- Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates
- Single-machine scheduling with early and tardy completion costs