Nonlinear programming and genetic search application for production scheduling in coal mines
From MaRDI portal
Publication:1593505
DOI10.1023/A:1018958209290zbMath0997.90540MaRDI QIDQ1593505
James A. Rodger, Parag C. Pendharkar
Publication date: 17 January 2001
Published in: Annals of Operations Research (Search for Journal in Brave)
Nonlinear programming (90C30) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30) Case-oriented studies in operations research (90B90)
Related Items (5)
A threshold-varying artificial neural network approach for classification and its application to bankruptcy prediction problem ⋮ An iterated greedy algorithm for the large-scale unrelated parallel machines scheduling problem ⋮ A mixed integer programming model for long term capacity expansion planning: a case study from the Hunter valley coal chain ⋮ GRASP with path-relinking for the non-identical parallel machine scheduling problem with minimising total weighted completion times ⋮ An empirical study of impact of crossover operators on the performance of non-binary genetic algorithm based neural approaches for classification.
This page was built for publication: Nonlinear programming and genetic search application for production scheduling in coal mines