Scheduling railway traffic at a construction site
From MaRDI portal
Publication:1597710
DOI10.1007/s291-002-8198-0zbMath1007.90022OpenAlexW4213360867MaRDI QIDQ1597710
Sigrid Knust, Peter Brucker, Silvia Heitmann
Publication date: 30 May 2002
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s291-002-8198-0
Deterministic scheduling theory in operations research (90B35) Traffic problems in operations research (90B20)
Related Items (8)
Rescheduling traffic on a partially blocked segment of railway with a siding ⋮ \(k\)-shortest routing of trains on shunting yards ⋮ An iterative approach for reducing the impact of infrastructure maintenance on the performance of railway systems ⋮ SAPI: statistical analysis of propagation of incidents. A new approach for rescheduling trains after disruptions ⋮ Computational complexity of convoy movement planning problems ⋮ Minimizing the maximal weighted lateness of delivering orders between two railroad stations ⋮ Two-directional traffic scheduling problem solution for a single-track railway with siding ⋮ Adjusting a railway timetable in case of partial or complete blockades
This page was built for publication: Scheduling railway traffic at a construction site