Set-up coordination between two stages of a supply chain
From MaRDI portal
Publication:1599325
DOI10.1023/A:1014934612090zbMath1015.90033MaRDI QIDQ1599325
Carlo Meloni, Paolo Detti, Dario Pacciarelli, Alessandro Agnetis
Publication date: 9 June 2002
Published in: Annals of Operations Research (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (15)
Setup coordination between two stages of a production system: a multi-objective evolutionary approach ⋮ Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption ⋮ Bi‐criteria formulation for green scheduling with unrelated parallel machines with sequence‐dependent setup times ⋮ A lower bound on the Hamiltonian path completion number of a line graph ⋮ Supply chain scheduling: sequence coordination ⋮ A linear algorithm for the Hamiltonian completion number of the line graph of a cactus. ⋮ The scheduling of deliveries in a production-distribution system with multiple buyers ⋮ Local search algorithms for finding the Hamiltonian completion number of line graphs ⋮ Scheduling deteriorating jobs on a single serial-batching machine with multiple job types and sequence-dependent setup times ⋮ A bi-objective coordination setup problem in a two-stage production system ⋮ Coordination in a two-stage production system: complexity, conflict and cooperation ⋮ Coordination of set-ups between two stages of a supply chain using multi-objective genetic algorithms ⋮ Optimally rescheduling jobs with a last-in-first-out buffer ⋮ Minimum Dominating Trail Set for Two-Terminal Series Parallel Graphs ⋮ A linear algorithm for the Hamiltonian completion number of the line graph of a tree
This page was built for publication: Set-up coordination between two stages of a supply chain