Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

MRP performance effects due to forecast bias and demand uncertainty

From MaRDI portal
Publication:1600889
Jump to:navigation, search

DOI10.1016/S0377-2217(01)00134-5zbMath1007.90034OpenAlexW2092309000MaRDI QIDQ1600889

S. T. Enns

Publication date: 16 June 2002

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0377-2217(01)00134-5


zbMATH Keywords

manufacturingproduction planningforecastingmaster production schedulingmaterial requirements planning


Mathematics Subject Classification ID

Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)


Related Items (3)

Analytical debiasing of corporate cash flow forecasts ⋮ Setting planned orders in master production scheduling under demand uncertainty ⋮ Time bucket length and lot-splitting approach




Cites Work

  • Due date assignment procedures with dynamically updated coefficients for multilevel assembly job shops
  • Safety Stock and Service Levels in Periodic Review Inventory Systems
  • Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system
  • Parameters affecting the effectiveness of MRP systems: A review




This page was built for publication: MRP performance effects due to forecast bias and demand uncertainty

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1600889&oldid=13896800"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 1 February 2024, at 02:35.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki