MRP performance effects due to forecast bias and demand uncertainty
From MaRDI portal
Publication:1600889
DOI10.1016/S0377-2217(01)00134-5zbMath1007.90034OpenAlexW2092309000MaRDI QIDQ1600889
Publication date: 16 June 2002
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(01)00134-5
manufacturingproduction planningforecastingmaster production schedulingmaterial requirements planning
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Related Items (3)
Analytical debiasing of corporate cash flow forecasts ⋮ Setting planned orders in master production scheduling under demand uncertainty ⋮ Time bucket length and lot-splitting approach
Cites Work
- Due date assignment procedures with dynamically updated coefficients for multilevel assembly job shops
- Safety Stock and Service Levels in Periodic Review Inventory Systems
- Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system
- Parameters affecting the effectiveness of MRP systems: A review
This page was built for publication: MRP performance effects due to forecast bias and demand uncertainty