Scheduling one-part-type serial manufacturing system under periodic demand: A solvable case
From MaRDI portal
Publication:1603316
DOI10.1016/S0305-0548(01)00024-7zbMath1005.90036OpenAlexW2072452474MaRDI QIDQ1603316
Konstantin Kogan, Sheldon X. C. Lou
Publication date: 11 July 2002
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0305-0548(01)00024-7
Cites Work
- Unnamed Item
- Unnamed Item
- DGAP -- The dynamic generalized assignment problem
- A maximum principle based combined method for scheduling in a flexible manufacturing system
- Optimal production control of a dynamic two-product manufacturing system with setup costs and setup times
- Sequencing with Earliness and Tardiness Penalties: A Review
- Balancing facilities in aggregate production planning: Make-to-order and make-to-stock environments
- One-machine n-part-type optimal setup scheduling: analytical characterization of switching surfaces
- Periodicity and chaos from switched flow systems: contrasting examples of discretely controlled continuous systems
This page was built for publication: Scheduling one-part-type serial manufacturing system under periodic demand: A solvable case