A fuzzy project scheduling approach to minimize schedule risk for product development
From MaRDI portal
Publication:1605061
DOI10.1016/S0165-0114(01)00146-4zbMath0993.90053MaRDI QIDQ1605061
Publication date: 11 July 2002
Published in: Fuzzy Sets and Systems (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items
Developing a heuristic algorithm for order production planning using network models under uncertainty conditions ⋮ Solving project scheduling problem with the philosophy of fuzzy random programming ⋮ Evaluation of the quantiles and superquantiles of the makespan in interval valued activity networks ⋮ Backtracking and exchange of information: Methods to enhance a beam search algorithm for assembly line scheduling ⋮ A fuzzy robust scheduling approach for product development projects. ⋮ New fuzzy models for time-cost trade-off problem ⋮ Project scheduling under uncertainty: survey and research potentials ⋮ A fuzzy robustness measure for the scheduling of commissioned product development projects ⋮ Developing a mathematical model for scheduling and determining success probability of research projects considering complex-fuzzy networks ⋮ Determination of fault-tolerant fabric-cutting schedules in a just-in-time apparel manufacturing environment
Cites Work