Project scheduling under time dependent costs -- a branch and bound algorithm
From MaRDI portal
Publication:1610883
DOI10.1023/A:1016046625583zbMath0993.90056OpenAlexW163276831MaRDI QIDQ1610883
A. Hardjawidjaja, N. R. Achuthan
Publication date: 20 August 2002
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1023/a:1016046625583
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Management decision making, including multiple objectives (90B50) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (4)
A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints ⋮ An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources ⋮ A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem
This page was built for publication: Project scheduling under time dependent costs -- a branch and bound algorithm