An optimization based approach to the train operator scheduling problem at Singapore MRT
From MaRDI portal
Publication:1610891
DOI10.1023/A:1016002910561zbMath0993.90501MaRDI QIDQ1610891
Johnny Pang, Jihong Ou, Chung-Piaw Teo, Kim Lin Chew, Qi-Zhang Liu
Publication date: 20 August 2002
Published in: Annals of Operations Research (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Case-oriented studies in operations research (90B90)
Related Items
An evolutionary and constructive approach to a crew scheduling problem in underground passenger transport ⋮ Optimising a coal rail network under capacity constraints ⋮ Locating optimal timetables and vehicle schedules in a transit line ⋮ A constraint programming-based approach to the crew scheduling problem of the Taipei mass rapid transit system ⋮ Railway crew scheduling: models, methods and applications ⋮ Scheduling trains as a blocking parallel-machine job shop scheduling problem
This page was built for publication: An optimization based approach to the train operator scheduling problem at Singapore MRT