On the average run lengths of quality control schemes using a Markov chain approach
From MaRDI portal
Publication:1613015
DOI10.1016/S0167-7152(01)00183-3zbMath0994.62110OpenAlexW2107951460MaRDI QIDQ1613015
Hansheng Xie, James C. Fu, Fred A. Spiring
Publication date: 5 September 2002
Published in: Statistics \& Probability Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0167-7152(01)00183-3
Applications of statistics in engineering and industry; control charts (62P30) Applications of Markov chains and discrete-time Markov processes on general state spaces (social mobility, learning theory, industrial processes, etc.) (60J20)
Related Items (12)
Statistical process control using Shewhart control charts with supplementary runs rules ⋮ Improving the performance of the chi-square control chart via runs rules ⋮ Design and optimization of EWMA control charts for in-control, indifference, and out-of-control regions ⋮ Unnamed Item ⋮ On distribution and average run length of a two-stage control process ⋮ A unified Markov chain approach for computing the run length distribution in control charts with simple or compound rules. ⋮ On the individuals chart with supplementary runs rules under serial dependence ⋮ A phase II nonparametric control chart based on precedence statistics with runs-type signaling rules ⋮ Unnamed Item ⋮ Improved Shewhart-type Runs-rules Nonparametric Sign Charts ⋮ Conditional waiting time distributions of runs and patterns and their applications ⋮ Monitoring exponential data using two-sided control charts with runs rules
Cites Work
- Non-negative matrices and Markov chains. 2nd ed
- Wald's approximations to the average run length in cusum procedures
- The effect of serial correlation on the in-control average run length of cumulative score charts
- On the Markov Chain Approach to the Two-Sided CUSUM Procedure
- The Distribution of the Run Length of One-Sided CUSUM Procedures for Continuous Random Variables
- Bounds for the Distribution of the Run Length of One-Sided and Two-Sided CUSUM Quality Control Schemes
- Average Run Lengths for CUSUM Schemes When Observations Are Exponentially Distributed
- Sampling inspection of continuous processes with no autocorrelation between successive results
- Average Run Lengths of Geometric Moving Average Charts by Numerical Methods
- The reliability of a large series system under Markov structure
- A a comparison of the markov chain and the integral equation approaches for evaluating the run length distribution of quality control charts
- Distribution Theory of Runs: A Markov Chain Approach
- An approach to the probability distribution of cusum run length
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: On the average run lengths of quality control schemes using a Markov chain approach