A study of the multi-stage flowshop scheduling problem with alternative operation assignments
From MaRDI portal
Publication:1613997
DOI10.1016/S0378-4754(01)00394-9zbMath1030.90032MaRDI QIDQ1613997
Yoshihiro Futatsuishi, Ichie Watanabe, Toshio Nakanishi
Publication date: 3 September 2002
Published in: Mathematics and Computers in Simulation (Search for Journal in Brave)
Cites Work
This page was built for publication: A study of the multi-stage flowshop scheduling problem with alternative operation assignments