An economic order quantity model for deteriorating item in a purchasing system with multiple prepayments

From MaRDI portal
Publication:1634133

DOI10.1016/j.apm.2014.02.014zbMath1428.90063OpenAlexW2007576980MaRDI QIDQ1634133

Ata Allah Taleizadeh

Publication date: 17 December 2018

Published in: Applied Mathematical Modelling (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.apm.2014.02.014




Related Items (26)

Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chainAn analysis of uncertain situation and advance payment system on a double-storage fuzzy inventory modelNon-instantaneous deterioration effect in ordering decisions for a two-warehouse inventory system under advance payment and backloggingRetailer's optimal strategy for a perishable product with increasing demand under various payment schemesInventory ordering policies for mixed sale of products under inspection policy, multiple prepayment, partial trade credit, payments linked to order quantity and full backorderingPrice discount facility in an EOQ model for deteriorating items with stock‐dependent demand and partial backloggingCoordination of a two‐echelon supply chain in presence of market segmentation, credit payment, and quantity discount policiesThe effect of advance payment with discount facility on supply decisions of deteriorating products whose demand is both price and stock dependentDelayed payment policy in multi-product single-machine economic production quantity model with repair failure and partial backorderingAn integrated inventory model for non-instantaneous deteriorating item under credit policy and partial backlogging with advertising and price dependent stochastic demandJoint pricing and inventory decisions with carbon emission considerations, partial backordering and planned discountsAn EOQ model for decaying item with full advanced payment and conditional discountEffects of multiple prepayments and green investment on an EPQ modelA lot sizing model with advance payment and planned backorderingSupply chain network design under advance-cash-credit paymentPricing and lot-sizing decision for fresh goods when demand depends on unit price, displaying stocks and product age under generalized paymentsUnnamed ItemInflationary induced EOQ model for Weibull distribution deterioration and trade creditsAn imprecise EOQ model for non-instantaneous deteriorating item with imprecise inventory parameters using interval numberInventory lot-size policies for deteriorating items with expiration dates and advance paymentsImperfect economic production quantity model with upstream trade credit periods linked to raw material order quantity and downstream trade credit periodsTwo-warehouse inventory model for deteriorating items with partial backlogging and advance payment schemeA unified EOQ model with financial constraints and market toleranceA new model of economic order quantity associated with a generalized conformable differential-difference operatorOptimal replenishment time for retailer under partial upstream prepayment and partial downstream overdue payment for quadratic demandTwo-level supply chain inventory model for perishable goods with fuzzy lead-time and shortages



Cites Work


This page was built for publication: An economic order quantity model for deteriorating item in a purchasing system with multiple prepayments