Dispatching algorithm for production programming of flexible job-shop systems in the smart factory industry
From MaRDI portal
Publication:1639306
DOI10.1007/S10479-017-2678-XzbMath1390.90322OpenAlexW2761608996MaRDI QIDQ1639306
Antonella Petrillo, Leidy E. Betancourt, Fabio De Felice, Miguel A. Ortíz, Kevin Parra Negrete
Publication date: 12 June 2018
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/11323/1383
Cites Work
- Unnamed Item
- A heuristic method for two-stage hybrid flow shop with dedicated machines
- A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria
- A heuristic to schedule flexible job-shop in a glass factory
- Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
- Scheduling flexible flow lines with sequence-dependent setup times
- Scheduling for two-stage production system with setup and assembly operations
- Machine scheduling with earliness, tardiness and non-execution penalties
- A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations
- New complexity results for parallel identical machine scheduling problems with preemption, release dates and regular criteria
- Routing and scheduling in a flexible job shop by tabu search
- A genetic algorithm for the flexible job-shop scheduling problem
- Sequencing a hybrid two-stage flowshop with dedicated machines
This page was built for publication: Dispatching algorithm for production programming of flexible job-shop systems in the smart factory industry