Mathematical programming models for competitive two-agent single-machine scheduling with flexible periodic maintenance activities
From MaRDI portal
Publication:1639885
DOI10.1007/s13369-014-1003-0zbMath1390.90329OpenAlexW2016664162MaRDI QIDQ1639885
Aihua Liu, Dar-Li Yang, Dehua Xu
Publication date: 13 June 2018
Published in: Arabian Journal for Science and Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s13369-014-1003-0
Related Items (4)
Mixed integer programming formulations for two-machine flow shop scheduling with an availability constraint ⋮ Proportionate flow shop scheduling with multi-agents to maximize total gains of JIT jobs ⋮ Single-machine scheduling with workload-dependent maintenance duration to minimize maximum lateness ⋮ Maintenance scheduling problem with fuzzy random time windows on a single machine
Cites Work
- Two-agent single-machine scheduling problems under increasing linear deterioration
- A note on the scheduling with two families of jobs
- Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan
- A note on ``scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
- Single-machine scheduling with periodic maintenance and nonresumable jobs.
- A Lagrangian approach to single-machine scheduling problems with two competing agents
- A note on the complexity of the problem of two-agent scheduling on a single machine
- A multiple-criterion model for machine scheduling
- Multi-agent scheduling on a single machine with max-form criteria
- Multi-agent single machine scheduling
- Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
- Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs
- Minimizing total flow time in the single-machine scheduling problem with periodic maintenance
- Single-machine scheduling with flexible and periodic maintenance
- Two-Agent Scheduling with Linear Deteriorating Jobs on a Single Machine
- Scheduling Problems with Two Competing Agents
This page was built for publication: Mathematical programming models for competitive two-agent single-machine scheduling with flexible periodic maintenance activities