Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic - MaRDI portal

The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic

From MaRDI portal
Publication:1651546

DOI10.1016/j.cor.2017.07.012zbMath1391.90263OpenAlexW2738556598MaRDI QIDQ1651546

Paz Perez-Gonzalez, Jose M. Framinan

Publication date: 12 July 2018

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://idus.us.es/handle//11441/96664




Related Items (6)



Cites Work


This page was built for publication: The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic