A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem
DOI10.1016/J.COR.2018.01.001zbMath1391.90258OpenAlexW2782268431MaRDI QIDQ1651597
Carlos Diego Rodrigues, Albert Einstein Fernandes Muritiba, Francíio Araùjo da Costa
Publication date: 12 July 2018
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2018.01.001
Programming involving graphs or networks (90C35) Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27)
Related Items (10)
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
- An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem
- Differential evolution for solving multi-mode resource-constrained project scheduling problems
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- PSPLIB -- a project scheduling problem library
- An exact algorithm for project scheduling with multiple modes
- A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem
- Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
- A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms
- Depth-First Search and Linear Graph Algorithms
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Handbook of metaheuristics
- Project scheduling with multiple modes: A genetic algorithm
This page was built for publication: A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem