Minimizing average project team size given multi-skilled workers with heterogeneous skill levels
DOI10.1016/j.cor.2015.11.011zbMath1391.90325OpenAlexW2176750819MaRDI QIDQ1651635
Matthias Walter, Jürgen Zimmermann
Publication date: 12 July 2018
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2015.11.011
mixed-integer programmingteam sizemulti-pass heuristicsmulti-project staffingmulti-skilled workerssocial loafing
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27) Discrete location and assignment (90B80) Theory of organizations, manpower planning in operations research (90B70)
Related Items (6)
Cites Work
- Unnamed Item
- Unnamed Item
- Algorithms for large scale shift minimisation personnel task scheduling problems
- A hierarchical procedure for multi-skilled sales force spatial planning
- Multilevel capacitated lotsizing complexity and LP-based heuristics
- Heuristics for workforce planning with worker differences
- A graph colouring model for assigning a heterogeneous workforce to a given schedule
- The capacitated distribution and waste disposal problem
- Rounding algorithms for covering problems
- Multi-skilled workforce optimisation
- A binary-rounding heuristic for multi-period variable-task-duration assignment problems
- Multi-start methods for combinatorial optimization
- Scheduling projects with multi-skilled personnel by a hybrid MILP/CP Benders decomposition algorithm
- A cardinality-constrained robust model for the assignment problem in home care services
- Scheduling and staffing multiple projects with a multi-skilled workforce
- The minimum shift design problem
- Staffing a software project: A constraint satisfaction and optimization-based approach
- A heuristic approach to project staffing
- Multi-objective human resources allocation in R&D projects planning
- An efficient metaheuristic for integrated scheduling and staffing IT projects based on a generalized minimum cost flow network
- Towards optimal formwork pairing on construction sites
- Threshold assignment algorithm
- LP-based heuristics for the capacitated lot-sizing problem: The interaction of model formulation and solution algorithm
- On a multi-project staffing problem with heterogeneously skilled workers
- Decision-making support system for human resource allocation in product development projects
This page was built for publication: Minimizing average project team size given multi-skilled workers with heterogeneous skill levels