Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines
From MaRDI portal
Publication:1651647
DOI10.1016/J.COR.2018.05.016zbMath1391.90274OpenAlexW2805642411MaRDI QIDQ1651647
Feng-Jang Hwang, Bertrand M. T. Lin
Publication date: 12 July 2018
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2018.05.016
Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30) Dynamic programming (90C39)
Related Items (2)
A comparison of priority rules for minimizing the maximum lateness in tree data gathering networks ⋮ Effective upper and lower bounds for a two-stage reentrant flexible flow shop scheduling problem
Cites Work
- Relocation scheduling subject to fixed processing sequences
- A note on ``A heuristic method for two-stage hybrid flow shop with dedicated machines
- A two-stage hybrid flow shop with dedicated machines at the first stage
- Minimizing total completion time in a two-stage hybrid flow shop with dedicated machines at the first stage
- A heuristic method for two-stage hybrid flow shop with dedicated machines
- Exact resolution of the two-stage hybrid flow shop with dedicated machines
- Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence
- Minimizing total completion time in two-stage hybrid flow shop with dedicated machines
- A taxonomy of flexible flow line scheduling procedures
- A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal
- Complexity of problem \(TF2|v=1,c=2|C_{\max}\)
- A two-stage flow shop scheduling problem with transportation considerations
- Batching and scheduling in a multi-machine flow shop
- Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times
- Minimum weighted number of tardy jobs on an \(m\)-machine flow-shop with a critical machine
- The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine
- Two-stage flowshop scheduling with a common second-stage machine
- Flow shop and open shop scheduling with a critical machine and two operations per job
- Optimal timing of a sequence of tasks with general completion costs
- Comments on Flow shop and open shop scheduling with a critical machine and two operations per job
- A note on the two-stage hybrid flow shop problem with dedicated machines
- Total completion time minimization in a \(2\)-stage differentiation flowshop with fixed sequences per job type
- Scheduling with batching: A review
- The hybrid flow shop scheduling problem
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- Minimizing Total Completion Time in a Two-Machine Flowshop: Analysis of Special Cases
- Optimal two- and three-stage production schedules with setup times included
- A two-stage flow shop scheduling with a critical machine and batch availability
- Planning and Scheduling in Manufacturing and Services
- On the two-stage hybrid flow shop with dedicated machines
- Scheduling of a Two-machine Flowshop with Travel Time Between Machines
- A HYBRID TWO-STAGE FLOWSHOP SCHEDULING PROBLEM
- The Lessons of Flowshop Scheduling Research
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- The open shop scheduling problem with a given sequence of jobs on one machine
- New complexity results on scheduling problem in a robotic cell
- Scheduling Groups of Jobs on a Single Machine
- Machine scheduling with transportation considerations
This page was built for publication: Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines