A multi-objective evolutionary algorithm guided by directed search for dynamic scheduling
DOI10.1016/j.cor.2016.04.024zbMath1391.90326OpenAlexW2346181637MaRDI QIDQ1652172
Yaochu Jin, Feng Liu, Du-Juan Wang
Publication date: 11 July 2018
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2016.04.024
predictiondynamic schedulinghistorical informationdirected search strategydynamic evolutionary multi-objective optimization
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (5)
Cites Work
- Rescheduling on identical parallel machines with machine disruptions to minimize total completion time
- A survey on offline scheduling with rejection
- A hybrid TP+PLS algorithm for bi-objective flow-shop scheduling problems
- A multi-objective particle swarm for a flow shop scheduling problem
- Rescheduling with release dates to minimize makespan under a limit on the maximum sequence disruption
- Rescheduling problems with deteriorating jobs under disruptions
- Evolutionary multi-criterion optimization. 4th international conference, EMO 2007, Matsushima, Japan, March 5--8, 2007. Proceedings
- A novel hybrid discrete differential evolution algorithm for blocking flow shop scheduling problems
- Rescheduling on a single machine with part-type dependent setup times and deadlines
- Solving multi-objective production scheduling problems using metaheuristics
- Executing production schedules in the face of uncertainties: a review and some future directions
- A survey of dynamic scheduling in manufacturing systems
- Pareto optimization of rescheduling with release dates to minimize makespan and total sequence disruption
- Meta-heuristics for stable scheduling on a single machine
- An improved heuristic for parallel machine scheduling with rejection
- An anticipative scheduling approach with controllable processing times
- Single-machine rescheduling with deterioration and learning effects against the maximum sequence disruption
- Rescheduling for Multiple New Orders
- A Review and Evaluation of Multiobjective Algorithms for the Flowshop Scheduling Problem
- Rescheduling for New Orders
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
This page was built for publication: A multi-objective evolutionary algorithm guided by directed search for dynamic scheduling