Resource-constrained project scheduling with flexible resource profiles in continuous time
From MaRDI portal
Publication:1652311
DOI10.1016/j.cor.2017.02.018zbMath1391.90294OpenAlexW2594305971MaRDI QIDQ1652311
Publication date: 11 July 2018
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2017.02.018
Mixed integer programming (90C11) Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35)
Related Items (7)
Multi-mode resource constrained project scheduling problem along with contractor selection ⋮ Benders decomposition for a period-aggregated resource leveling problem with variable job duration ⋮ A continuous-time formulation for optimal task scheduling and quality-of-service assurance in nanosatellites ⋮ Project scheduling to minimize the makespan under flexible resource profiles and marginal diminishing returns of the resource ⋮ Polyhedral results and valid inequalities for the continuous energy-constrained scheduling problem ⋮ An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Revenue sharing for resource transfer among projects
Uses Software
Cites Work
- MIP models for resource-constrained project scheduling with flexible resource profiles
- Event-based MILP models for resource-constrained project scheduling problems
- A priority-rule method for project scheduling with work-content constraints
- Insertion techniques for static and dynamic resource-constrained project scheduling.
- A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles
- A branch-and-cut algorithm for scheduling of projects with variable-intensity activities
- Unnamed Item
This page was built for publication: Resource-constrained project scheduling with flexible resource profiles in continuous time