Integrated aircraft-path assignment and robust schedule design with cruise speed control
DOI10.1016/j.cor.2017.03.005zbMath1391.90310OpenAlexW2598274120MaRDI QIDQ1652323
Sinan Gürel, Özge Şafak, M. Selim Akturk
Publication date: 11 July 2018
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/11693/48529
chance constraintsairline schedulingcruise time controllabilityfleet type assignmentsecond order conic programming
Applications of mathematical programming (90C90) Multi-objective and goal programming (90C29) Stochastic programming (90C15) Deterministic scheduling theory in operations research (90B35) Discrete location and assignment (90B80)
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- An integrated scenario-based approach for robust aircraft routing, crew pairing and re-timing
- A novel passenger recovery approach for the integrated airline recovery problem
- Preparing for catastrophic climate change
- An integrated aircraft routing, crew scheduling and flight retiming model
- Integrated airline scheduling
- A multi-objective approach for robust airline scheduling
- An iterative approach to robust and integrated aircraft routing and crew scheduling
- A Benders decomposition approach for an integrated airline schedule design and fleet assignment problem with flight retiming, schedule balance, and demand recapture
- Perspective reformulations of mixed integer nonlinear programs with indicator variables
- Lectures on Modern Convex Optimization
- Airline Fleet Assignment with Time Windows
- An Efficient Airline Re-Fleeting Model for the Incremental Modification of Planned Fleet Assignments
- Aircraft Rescheduling with Cruise Speed Control
- An Integer Optimization Approach to Large-Scale Air Traffic Flow Management
- Two-Stage Fleet Assignment Model Considering Stochastic Passenger Demands
- Building Reliable Air-Travel Infrastructure Using Empirical Data and Stochastic Models of Airline Networks
- Integrated aircraft and passenger recovery with cruise time controllability
This page was built for publication: Integrated aircraft-path assignment and robust schedule design with cruise speed control