The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model

From MaRDI portal
Publication:1664892

DOI10.1155/2015/182781zbMath1394.90050OpenAlexW1588119261WikidataQ57719407 ScholiaQ57719407MaRDI QIDQ1664892

Claudio F. M. Toledo, Reinaldo Morabito, Alf Kimms, Paulo Morelato França

Publication date: 27 August 2018

Published in: Mathematical Problems in Engineering (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1155/2015/182781




Related Items (2)



Cites Work


This page was built for publication: The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model