Efficient heuristic algorithm for scheduling two-stage hybrid flowshop with sequence-dependent setup times
From MaRDI portal
Publication:1665637
DOI10.1155/2015/420308zbMath1394.90284OpenAlexW1549025930WikidataQ59118529 ScholiaQ59118529MaRDI QIDQ1665637
Seong-Hoon Choi, Jung Man Hong, Geun-Cheol Lee
Publication date: 27 August 2018
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2015/420308
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (2)
Solving distributed two-stage hybrid flowshop scheduling using a shuffled frog-leaping algorithm with memeplex grouping ⋮ A Pareto-based adaptive variable neighborhood search for biobjective hybrid flow shop scheduling problem with sequence-dependent setup time
Cites Work
- Optimization by Simulated Annealing
- An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times
- Johnson's rule, composite jobs and the relocation problem
- Scheduling flexible flow lines with sequence-dependent setup times
- The hybrid flow shop scheduling problem
- Optimal two- and three-stage production schedules with setup times included
- Optimization by Simulated Annealing: An Experimental Evaluation; Part I, Graph Partitioning
- Two-Stage, Hybrid Flowshop Scheduling Problem
This page was built for publication: Efficient heuristic algorithm for scheduling two-stage hybrid flowshop with sequence-dependent setup times