Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

No-wait flexible flow shop scheduling with due windows

From MaRDI portal
Publication:1665716
Jump to:navigation, search

DOI10.1155/2015/456719zbMath1394.90277OpenAlexW1539307054WikidataQ59118625 ScholiaQ59118625MaRDI QIDQ1665716

Chang-Lin Yang, Rong-Hwa Huang, Shang-Chia Liu

Publication date: 27 August 2018

Published in: Mathematical Problems in Engineering (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1155/2015/456719



Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items (1)

A survey of scheduling problems with no-wait in process



Cites Work

  • A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times
  • A non-delayed relax-and-cut algorithm for scheduling problems with parallel machines, due dates and sequence-dependent setup times
  • Approximative procedures for no-wait job shop scheduling.
  • The two-machine flowshop no-wait scheduling problem with a single server to minimize the total completion time
  • A heuristic approach for two-machine no-wait flowshop scheduling with due dates and class setups
  • A new heuristic and dominance relations for no-wait flowshops with setups
  • Parallel machine scheduling with a common due window


This page was built for publication: No-wait flexible flow shop scheduling with due windows

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1665716&oldid=13978746"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 1 February 2024, at 04:50.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki