Integrated supply chain cooperative inventory model with payment period being dependent on purchasing price under defective rate condition
From MaRDI portal
Publication:1665876
DOI10.1155/2015/513435zbMath1394.90147OpenAlexW1989589696WikidataQ59118815 ScholiaQ59118815MaRDI QIDQ1665876
Publication date: 27 August 2018
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2015/513435
Transportation, logistics and supply chain management (90B06) Inventory, storage, reservoirs (90B05)
Related Items (2)
Cooperative inventory games in multi-echelon supply chains under carbon tax policy: vertical or horizontal? ⋮ Ordering policies of a deteriorating item in an EOQ model under upstream partial order-quantity-dependent trade credit and downstream full trade credit
Cites Work
- An integrated inventory model under conditions of order processing cost reduction and permissible delay in payments
- An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments
- Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
- Inventory games.
- A comprehensive extension of an integrated inventory model with ordering cost reduction and permissible delay in payments
- Three-echelon inventory model with permissible delay in payments under controllable lead time and backorder consideration
- Three-layer supply chain - A production-inventory model for reworkable items
- Inventory games with permissible delay in payments
- Economic Order Quantity under Conditions of Permissible Delay in Payments
- An ordering policy for deteriorating items with allowable shortage and permissible delay in payment
- Defective units in a continuous review (s, Q) system
- On the economic order quantity under conditions of permissible delay in payments
- Ordering Policies of Deteriorating Items under Permissible Delay in Payments
This page was built for publication: Integrated supply chain cooperative inventory model with payment period being dependent on purchasing price under defective rate condition