Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Integrated production-distribution scheduling problem with multiple independent manufacturers

From MaRDI portal
Publication:1666043
Jump to:navigation, search

DOI10.1155/2015/579893zbMath1394.90274OpenAlexW1586445897WikidataQ59119444 ScholiaQ59119444MaRDI QIDQ1666043

Dakui Jiang, Jianhong Hao, Lisi Cao

Publication date: 27 August 2018

Published in: Mathematical Problems in Engineering (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1155/2015/579893



Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)



Uses Software

  • CPLEX



Cites Work

  • Approximation algorithms for two-machine open shop scheduling with batch and delivery coordination
  • The coordination of scheduling and batch deliveries
  • Order splitting with multiple capacitated suppliers
  • Integrated machine scheduling and vehicle routing with time windows
  • Integrated Production and Outbound Distribution Scheduling: Review and Extensions
  • Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and distribution cost
  • Order Assignment and Scheduling in a Supply Chain
  • Integrated Scheduling of Production and Distribution Operations
  • Supply Chain Scheduling: Batching and Delivery




This page was built for publication: Integrated production-distribution scheduling problem with multiple independent manufacturers

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1666043&oldid=13978444"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 1 February 2024, at 04:50.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki